Pump Spec (2016 Putzmeister M)
Pump Year 2016 Pump Make Putzmeister
Pump Model TKB-80 Pump Kit 80yd3/hr
# Section Boom Length
Pump Hours 2,300 hrs PTO Condition
Valve Condition Ball Valve (Good) Material Cylinder Good
Boom System Outrigger Manual
Agitator Hopper Good
Paint Good Remote Yes
Boom Certification Pump Overall In great condition
Pump Note Ready to work.
Pump Year 2016
Pump Make Putzmeister
Pump Model TKB-80
Pump Kit 80yd3/hr
# Section
Boom Length
Pump Hours 2,300 hrs
PTO Condition
Valve Condition Ball Valve (Good)
Material Cylinder Good
Boom System
Outrigger Manual
Agitator
Hopper Good
Paint Good
Remote Yes
Boom Certification
Pump Overall In great condition
Pump Note Ready to work.
  • This equipment is located in Miami Area
Truck Spec ( )
Truck Year Truck Make
Truck Model Horse Power
Engine Manufacture Engine Hours hrs
Transmission Transmission Condition
Cab Exterior Condition Cab Interior Condition
Front Tire Rear Tire
Mileage mi Hub Mileage
Truck Inspection Truck Overall
Truck Note
Truck Year
Truck Make
Truck Model
Horse Power
Engine Manufacture
Engine Hours hrs
Transmission
Transmission Condition
Cab Exterior Condition
Cab Interior Condition
Front Tire
Rear Tire
Mileage mi
Hub Mileage
Truck Inspection
Truck Overall
Truck Note
  • The information disclosed is subject to change. Please inquire within.
Buying Guide
  • Buying Guide
    • Make sure to use written form of contract when purchasing used equipments.
    • Make sure to check any financing charges or lien on the Vehicle Title.
    • Check for Recalls, Truck DMV inspection, Permits, Accident or Pump Damage History.
    • Be aware of importing process if equipment is located in foreign country.
  • Liability Disclaimer/Legal Notice
    • Concrete Pump Hub has no knowledge of the any equipment listed in this web site other than disclosed by the owner.
    • Concrete Pump Hub has no legal liability in any of the sales made by using the listed information

Concrete Pump Hub