Pump Spec (2004 Putzmeister M)
Pump Year 2004 Pump Make Putzmeister
Pump Model TKB-60 Pump Kit 60yd3/h
# Section Boom Length
Pump Hours 2,000 hrs PTO Condition
Valve Condition Ball Valve (Good) Material Cylinder Very Good
Boom System Outrigger
Agitator Good Hopper Good
Paint Fair Remote Yes
Boom Certification Pump Overall Good Pump
Pump Note Piston cups replaced, new hydraulic oil, new battery cables & box, new tires.
Pump Year 2004
Pump Make Putzmeister
Pump Model TKB-60
Pump Kit 60yd3/h
# Section
Boom Length
Pump Hours 2,000 hrs
PTO Condition
Valve Condition Ball Valve (Good)
Material Cylinder Very Good
Boom System
Outrigger
Agitator Good
Hopper Good
Paint Fair
Remote Yes
Boom Certification
Pump Overall Good Pump
Pump Note Piston cups replaced, new hydraulic oil, new battery cables & box, new tires.
  • This equipment is located in Florida
Truck Spec ( )
Truck Year Truck Make
Truck Model Horse Power
Engine Manufacture Engine Hours hrs
Transmission Transmission Condition
Cab Exterior Condition Cab Interior Condition
Front Tire Rear Tire
Mileage mi Hub Mileage
Truck Inspection Truck Overall
Truck Note
Truck Year
Truck Make
Truck Model
Horse Power
Engine Manufacture
Engine Hours hrs
Transmission
Transmission Condition
Cab Exterior Condition
Cab Interior Condition
Front Tire
Rear Tire
Mileage mi
Hub Mileage
Truck Inspection
Truck Overall
Truck Note
  • The information disclosed is subject to change. Please inquire within.
Buying Guide
  • Buying Guide
    • Make sure to use written form of contract when purchasing used equipments.
    • Make sure to check any financing charges or lien on the Vehicle Title.
    • Check for Recalls, Truck DMV inspection, Permits, Accident or Pump Damage History.
    • Be aware of importing process if equipment is located in foreign country.
  • Liability Disclaimer/Legal Notice
    • Concrete Pump Hub has no knowledge of the any equipment listed in this web site other than disclosed by the owner.
    • Concrete Pump Hub has no legal liability in any of the sales made by using the listed information

 

 

Concrete Pump Hub